
Add to Cart
Easy erection B-Form Adjustable Column & Shear wall Modular Vertical Formwork Shuttering system
Shortage skilled labour?
Erect formwork too slow?
Difficult to reusable for next project?
Large disposable waste?
Financial pressure?
B-form adjustable column & wall formwork system can help you solve these problem.
More Quickly:
- Quickly erection and dismantlement. 20 minites complete a column formwork including all fastening work.
- Modular design, be suitable for any different shap and dimension vertical concrete body.
- Needn´t re-assembly when change the working place. Wheel set moving formwork only by manpower is enough.
- All operation by awl is enough
MoreSafety:
- High strength ability panel. 90KN/m2 load capacity
- Free disposal materials lead to clean worksite. More clean more safe.
- Complying with European safety standards.
MoreSimplicity:
- Only awl be required in operation.
- Manual erection and movement, minimal crane required
- Easy to train and no skilled labour required
- Standardized panel and multipurpose accessories
Regular size and customized dimenstion is workable.
Packaging & Shipping
Our Services
Experienced engineer team help you make professional construction plan and proposal. We are not only manufacturer but also is integral solution supplier.
Company Information
FAQ
A: We are factory and also supply completeplan and designservice.
A: Yes, we could make the detail proposal as project drawing free. For construction site service need some charge for cost.
A: Formwork are system product, the finally cost must be confirmed by actual structure requirement, the unit price we list here is on typical average situation.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment<=10000USD, 100% in advance. Payment>=10000USD, 30% T/T in advance ,balance before shippment.